Model Number: CJD-20KW-#6274
Brand Name: ZONHAN
Key Specifications/Special Features:
		Operation method:1) Firstly, check whether all components are completed and the intake of penstock is blocked. 2) Then check whether the runner of turbine can be easily rotated, and rotated in by hand to ensure the voltage meter has readings (put the output switch in OFF position).3) For the first starting, the output switch should be put in the voltage-stabilized control position (A), then open the gate to let water out from small to large, observe the readings meter till 230V (380V) or so continue enhancing water volume, the voltage device is reliable if the reading keep still. At this time the load can be connected, then adjust the water volume to hold the output of 230V (380V) or so. Once the stabilizing device break down, put the switch in B, then the voltage of unit will be under manual-controlled, you may follow the next procedure to control by valve.4) During the operation, the load should be kept stable as possible as can be. Don't shut off the load suddenly, or else the high voltage will burn out the rest load, if you must is connect the load, you may decrease water to small volume at first, then disconnect the most part of load when the voltage has dropped to below 380v (you must do as this even you run the unit under the using of voltage-stabilizing device).5) It need only close the valve to switch off the unit when the load has been stable after first operation, the power switch may hold on so that you may adjust voltage up to 230V (380V) directly for next running.
		
			
Model Power  
Head  
Rated of flow  
Rotational speed  
Install tube diameter  
(W) 
(M) 
(M3/S) 
(RMP) 
(MM) 
 
CJ-300W 
300 
12-14 
0.003-0.005 
1500 
50 
 
CJ-500W 
500 
12-18 
0.005-0.007 
1500 
50-75 
 
CJ-750W 
750 
14-18 
0.005-0.008 
1500 
75 
 
CJ-1.5KW 
1500 
18-25 
0.008-0.011 
1500 
125 
 
CJD-1.5KW 
1500 
15 
0.012-0.018 
1500 
125-150 
 
CJ-3KW 
3000 
25-35 
0.015-0.019 
1500 
125-150 
 
CJD-3KW 
3000 
18-20 
0.018-0.030 
1500 
150 
 
CJ-6KW 
6000 
28-35 
0.030-0.038 
1500 
150-200 
 
CJD-6KW 
6000 
18-20 
0.038-0.050 
1000 
200 
 
CJ-10KW 
10000 
30-38 
0.040-0.050 
1500 
200-250 
 
CJD-10KW 
10000 
25-30 
0.050-0.060 
1000 
200-250 
 
CJD-12KW 
12000 
28-35 
0.050-0.060 
1500 
200-250 
 
CJD-15KW 
15000 
30-40 
0.060-0.070 
1500/1000 
200 
 
CJD-20KW 
20000 
30-45 
0.060-0.100 
1500/1000 
250-300 
 
CJD-30KW 
30000 
38-45 
0.090-0.120 
1500/1000 
250-300 
 
Shipping Information:
- FOB Port: Shanghai
- Lead Time: 20 - 35 days
Main Export Markets:
- Central/South America
- North America
- Western Europe
 
  
  
 
 
 Click image to view full size image
 Click image to view full size image